Job Description
West Wharf - Upgradation of Foam System in Generator Room
Enhancement Posted On: November 7, 2024 Closing On: November 12, 2024
Scope of Work: • Protect the area and assets before start the work. • Supply and installation of control panel. • Supply and installation of detectors, Manual release station and necessary output units as per the site requirements. • Modification of existing system with panels. • Testing and commissioning. • Clean the area and Hand over. • Materials warranty & workmanship warranty should be min. 3 years from the handover date.
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.