https://bayt.page.link/nanWu3bnkEmuzMA28
Create a job alert for similar positions

Job Description

Replacement of Defective Spare Parts - Garbage chute - BTR



Break Down Posted On: October 9, 2024 Closing On: October 15, 2024

1. Non-Recyclable Chute Maintenance



The following components require maintenance or replacement on specified floors:

Door Shock Absorbers:



08 Nos. Changing Floors: 31, 30, 28, 27, 26, 22, 20, 19

Door Electromagnetic Locks:



05 Nos. Changing Floors: 25, 24, 20, 19, 17

Door Indicators:



01 Nos. Fixing new Floors: 21, 20, 19, 18, 17

Control Panel Indicator:



01 Nos. Fixing new at control panel 1 x 10 = 10/-

Brush Cylinder:



01 Nos. Supplying & Fixing new (60 Día)
Brush Wire Rope:
01 Nos. Supplying & Fixing new (Stainless Steel)
Fire Cutoff Door:
01 Nos. Fusible Link & both sides Spring Changing

Fire Cutoff Door Specifications:



Fusible Link & Twin Spring System:



Installation of a new fusible link and stainless-steel twin spring loaded system for the automatic operation of the fire cutoff door. In the event of a fire, the fusible link (operating at 161˚F) will break, triggering the twin spring system to automatically close the fire cut-off door.

Fusible Link Specification:



UL Certified, made in the USA.

Fire Rated Painting:



Apply fire-rated paint to the fire cutoff door to ensure compliance with safety standards.

2. Recyclable Chute Maintenance



The following components require maintenance or replacement on specified floors:

Door Shock Absorbers:



03 Nos. Changing Floors: 27, 30

Door Electromagnetic Locks:



04 Nos. Changing Floors: 22, 21, 19, 17 4 x 140 = 560/-

Door Indicators:



02 Nos. Fixing new Floors: 18, 3 2 x 10 = 20/-

Fire Cutoff Door:



01 Nos. Fusible Link & both sides Spring Changing

Fire Cutoff Door Specifications (Recyclable Chute):



Fusible Link & Twin Spring System:



Installation of a new fusible link and stainless-steel twin spring loaded system for the automatic operation of the fire cutoff door. The fusible link will break at 161˚F, allowing the twin spring system to close the fire cut-off door automatically.

Fusible Link Specification:



UL Certified, made in the USA.

Fire Rated Painting:



+ Apply fire-rated paint to the fire cutoff door to ensure safety and durability.

General Notes:



- All materials and components should meet the specified safety and quality standards.
- The vendor must ensure compliance with fire safety regulations, including the use of certified materials (e.g., UL Certified fusible links).
- Any work requiring access to the chute system must be coordinated with building management to minimize disruption to residents.
- The vendor is responsible for cleaning up the work area after completing the maintenance tasks.

NOTE TO VENDORSAs per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant authority in the Emirate of Dubai. Before you apply for any job in the Emirate of Dubai, please make sure to comply with regulatory requirements. Failure to do so can result in stoppage of funds through Escrow Account. *HOAM bears no liability towards any payment that is withheld by the Escrow Operator.


b. consider all risks, contingencies and other circumstances relating to the delivery of the Requirements and include adequate provision in its Proposal to manage such risks and contingencies. c. document in its Proposal all assumptions and qualifications made about the delivery of the Requirements, including any assumption that HOAM or a third party will deliver any aspect of the Requirements or incur any cost related to the delivery of the Requirements. 12. HOAM will convene an evaluation panel comprising members chosen for their relevant expertise and experience. In addition, HOAM may invite independent advisors to evaluate any Proposal, or any aspect of any Proposal. a. each Vendor’s understanding of the Requirements, capability to fully deliver the Requirements and willingness to meet the terms and conditions of the Proposed Contract 22. HOAM will advise Vendors if they have been shortlisted or not. Being shortlisted does not constitute acceptance by HOAM of the Vendor’s Proposal, or imply or create any obligation on HOAM to enter into negotiations with, or award a Contract for delivery of the Requirements to any shortlisted Vendor/s. At this stage in the RFP process HOAM will not make public the names of the shortlisted Vendors.
1. All enquiries regarding the RFP must be directed to HOAM’s Point of Contact.
2. Vendors must not directly or indirectly approach any representative of HOAM, or any other person, to solicit information concerning any aspect of the RFP.
3. Only the Point of Contact, and any authorised person of HOAM, are authorised to communicate with Vendors regarding any aspect of the RFP. HOAM will not be bound by any statement made by any other person.
4. HOAM may change the Point of Contact at any time. This notification may be posted on the system.
Where a Vendor has an existing contract with HOAM then business as usual communications, for the purpose of managing delivery of that contract, will continue using the usual contacts. Vendors must not use business as usual contacts to lobby HOAM, solicit information or discuss aspects of the RFP.
6. Each Vendor must accept and adhere to the Conflict of Interest declaration in the Response Form and must immediately inform HOAM should a Conflict of Interest arise during the RFP process. A material Conflict of Interest may result in the Vendor being disqualified from participating further in the RFP.
7. Vendors must not attempt to influence or provide any form of personal inducement, reward or benefit to any representative of HOAM in relation to the RFP.
8. A Vendor who attempts to do anything prohibited may be disqualified from participating further in the RFP process.
9. HOAM reserves the right to require additional declarations, or other evidence from a Vendor, or any other person, throughout the RFP process to ensure probity of the RFP process.
10. Vendors must not engage in collusive, deceptive or improper conduct in the preparation of their Proposals or other submissions or in any discussions or negotiations with HOAM. Such behaviour will result in the Vendor being disqualified from participating further in the RFP process. In submitting a Proposal the Vendor warrants that its Proposal has not been prepared in collusion with a Competitor.
11. HOAM reserves the right, at its discretion, to report suspected collusive or anticompetitive conduct by Vendors to the appropriate authority and to give that authority all relevant information including a Vendor’s Proposal.
12. HOAM and Vendor will each take reasonable steps to protect Confidential Information and, without limiting any confidentiality undertaking agreed between them, will not disclose Confidential Information to a third party without the other’s prior written consent.
13. HOAM and Vendor may each disclose Confidential Information to any person who is directly involved in the RFP process on its behalf, such as officers, employees, consultants, contractors, professional advisors, evaluation panel members, partners, principals or directors, but only for the purpose of participating in the RFP.
14. Vendors acknowledge that by law, HOAM will not be in breach of its obligations if Confidential Information is disclosed by HOAM to the appropriate authority because of suspected collusive or anticompetitive tendering behaviour. Where HOAM receives a request that relates to a Vendor’s Confidential Information HOAM will consult with the Vendor and may ask the Vendor to explain why the information is considered by the Vendor to be confidential or commercially sensitive.
15. For the duration of the RFP, to the date of

Job Details

Job Location
Dubai United Arab Emirates
Company Industry
Other Business Support Services
Company Type
Unspecified
Employment Type
Unspecified
Monthly Salary Range
Unspecified
Number of Vacancies
Unspecified
You have reached your limit of 15 Job Alerts. To create a new Job Alert, delete one of your existing Job Alerts first.
Similar jobs alert created successfully. You can manage alerts in settings.
Similar jobs alert disabled successfully. You can manage alerts in settings.