Rectification of Booster Pump Control Panel
Break Down Posted On: February 26, 2025 Closing On: March 1, 2025
Rectification of Booster Pump Control Panel
· Removing faulty 4KW VFD from the Panel-01nos
· Supply and Installation of new 4KW VFD (Schneider ATV310HU40N4E)-01nos
· Control wiring & Power wiring of VFD as per site requirement-LS
· Programming of VFD as per site requirement-01nos
· Supply and Installation of 9A Contactors-02nos
· Control wiring rectification and modification of the panel as per site requirement
· Operation Check of the panel, Testing & Commissioning
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.