https://bayt.page.link/ssZqepfL2aYQgPNN7
Back to the job results

Rectification of Booster Pump Control Panel

Today 2025/06/27
Other Business Support Services
Create a job alert for similar positions

Job Description

Rectification of Booster Pump Control Panel



Break Down Posted On: February 26, 2025 Closing On: March 1, 2025

Rectification of Booster Pump Control Panel



· Removing faulty 4KW VFD from the Panel-01nos
· Supply and Installation of new 4KW VFD (Schneider ATV310HU40N4E)-01nos
· Control wiring & Power wiring of VFD as per site requirement-LS
· Programming of VFD as per site requirement-01nos
· Supply and Installation of 9A Contactors-02nos
· Control wiring rectification and modification of the panel as per site requirement
· Operation Check of the panel, Testing & Commissioning
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

You have reached your limit of 15 Job Alerts. To create a new Job Alert, delete one of your existing Job Alerts first.
Similar jobs alert created successfully. You can manage alerts in settings.
Similar jobs alert disabled successfully. You can manage alerts in settings.