https://bayt.page.link/eS87idSKGrLcRGqT6
Back to the job results

Kids Pool Slide Structure (Supply & Installation)

2 days ago 2025/06/19
Other Business Support Services
Create a job alert for similar positions

Job Description

Kids Pool Slide Structure (Supply & Installation)



Product Posted On: February 17, 2025 Closing On: February 20, 2025 Kids Pool Slide Structure (Supply & Installation) Quantity: 1 Assembly/Unit

1. Site Preparation:



Clear the designated installation area for the pool slide. Ensure the ground is level, stable, and meets safety regulations.

2. Design and Materials Selection:



Finalize the design of the timber structure according to the required dimensions and safety standards. Select high-quality, durable, and weather-resistant timber materials suitable for outdoor use.

3. Timber Frame Construction:



Fabricate the timber frame, including vertical supports, horizontal beams, and the slide structure. Treat timber for resistance against water, termites, and rot. Assemble the frame and fix it securely to the ground.

4. Slide Installation:



Install the slide surface (usually made from fiberglass or plastic) onto the timber structure. Ensure the slide has smooth edges, a safe incline, and a proper water flow system.

5. Safety Features:



Install safety rails, non-slip steps, and any other safety features as per regulations. Ensure that all parts are free of sharp edges, splinters, or any other hazards.

6. Final Inspection:



Conduct a thorough inspection to ensure the structure is stable, secure, and meets all safety requirements. Test the slide for proper slide quality, and safety features.

7. Cleaning and Handover:



Clean up the installation site. Provide any necessary maintenance instructions and warranties.
Community details: Royal Park Jumeirah Park Site contact: Mr. Sajid - 0551650145 No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

You have reached your limit of 15 Job Alerts. To create a new Job Alert, delete one of your existing Job Alerts first.
Similar jobs alert created successfully. You can manage alerts in settings.
Similar jobs alert disabled successfully. You can manage alerts in settings.