https://bayt.page.link/vCW44rWojKpaHRRK8
Create a job alert for similar positions

Job Description

Aluminum Door Installation for B#3 Pump Room and Garbage Room



Services Posted On: November 1, 2024 Closing On: November 8, 2024 Aluminum Door Installation for B#3 Pump Room and Garbage Room
Supply and installation of aluminum door pump room off glass and off aluminum clear glass 6mm temper and polish. Supply and installation of garbage rooms Heavy duty aluminum Lower door side 2 /2 pieces change old one remove and fix new one.
Building Name: Horizon Tower
Location: Marsa Street, Dubai Marina
Contact details: Engineer Ramana - 050 272 5615 No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
You have reached your limit of 15 Job Alerts. To create a new Job Alert, delete one of your existing Job Alerts first.
Similar jobs alert created successfully. You can manage alerts in settings.
Similar jobs alert disabled successfully. You can manage alerts in settings.