https://bayt.page.link/ZfsaTeDPWHbu6BHh7
Create a job alert for similar positions

Job Description


Assystem STUP employs 1500 engineers who provide support to clients in the transportation, urban development, decarbonised energy, and industrial and complex buildings markets. With its headquarters in Delhi, Assystem STUP also has a local presence throughout India with 9 offices spread across the country. Assystem STUP’s teams have already been involved in many projects such as the construction of Dassault factories in Nagpur, preliminary studies of future EPR nuclear reactors in India, the development of the road transport networks in Mumbai, and others.





Job Description

For the sack of a clear distinction between the two scopes, the task types are strictly divided into


2 categories: tasks specific to EWP(Engineering Work Package) anticipation (EA) and tasks specific to TOP(Turn Over Package) anticipation


Check a Technical drawing or diagram together with the associated BoM and 3D


Check technical document using IO requirements and industrial best practices (e.g. validation of standard representation of information, and/or technical aspect and/or project quality related)


Check the overall technical document input of EWP production


Check the overall drawing or diagram or BoM quality, and consistency with specific rules applicable for the TD type and EWP requirements (ISO standards & CAD manual & and ITER plant General plans & discipline dedicated drawings.


TOP CAD deliverables performance analysis, Weekly provide performance analysis and status of TOP CAD deliverables, Monthly detailed activity report  Yearly global report


2D-3D Review related to Manufacturing, Assembly & Installation for a given EWP


o Provide industrial expertise to TRO or DO management in the frame of mechanical design, plant design, construction and operation, Produce dedicated EWP Documentation, Defining and documenting Process and Methodology dedicated to address specific EWP problematics


Preparation and support for Initial Report (deliverable) for a given EWP


Preparation and support for Progress Report (deliverable) for a given EWP


Preparation and support for Final Report (deliverable) for a given EWP


Preparation and support for Produce dedicated TOP Documentation


Input Engineering Data applicability and completeness control


To perform the control of the available of engineering data to be used as input for


the production of CAD data dedicated to Operation,


Corrective Actions for Input Engineering Data Completion Support the correction of the discrepancies reported by a TA2 activity


Control of Operation CAD Data production outputs


Control after their approval process that the CAD data produced specifically for


Operation purposes – meaning the CAD documents and their associated BOMs,


including the mandatory properties of the listed equipment


Review of the on-site red-marks session reports


I. To review and assess the completeness and usability by the designers of the redmarks


and annotation performed during site-visits


II. To request additional information and details to the site visit RO when necessary


for the designer to be able to produce the corresponding update of the annotated


CAD documents




My profile

Required Skill: Aveva E3D, Aveva Engineering, Aveva Diagram


Project: ITER France (L3 Offshore)


Sector: Nuclear Energy


Minimum Experience: 5 years




We are committed to equal treatment of candidates and promote, as well as foster all forms of diversity within our company. We believe that bringing together people with different backgrounds and perspectives is essential for creating innovative and impactful solutions. Skills, talent, and our people’s ability to dare are the only things that matter !. Bring your unique contributions and help us shape the future.





You have reached your limit of 15 Job Alerts. To create a new Job Alert, delete one of your existing Job Alerts first.
Similar jobs alert created successfully. You can manage alerts in settings.
Similar jobs alert disabled successfully. You can manage alerts in settings.