1- Study the projects’ structural and architectural drawings to determine the technical data needed for designing the scaffolding items.
2- Communicate with the Warehouse to check the available scaffolding items.
3- Determine the scaffolding system that will be utilized in coordination with the Section Head.
4- Prepare the drawings of the scaffolding items after making the static calculations needed to ensure meeting safety standards.
5- Supervise the scaffolding engineers and review their drawings to ensure they are carrying out their responsibilities effectively.
6- Conduct and review quantity survey for the scaffolds needed for every project based on the drawings.
7- Review the scaffolding drawings and static calculations submitted by the Subcontractors to ensure that the material used meet the scaffolding standards.
8- Send the scaffold drawings and static calculations sheet to the Technical Office when requested.
9- Conduct site visits for inspection, when needed, to ensure that the execution comply with the drawings.