Waterproofing, Tiling, and Plumbing works at common area Palazzo Residence, JVC



Break Down Posted On: November 5, 2024 Closing On: November 10, 2024

Scope of Work- Waterproofing, Tiling, and Plumbing works



Project Details:



Location: Palazzo Residence, JVC Job Type: Waterproofing,Tiling and Plumbing works

Scope of Work*:


1 .Site Preparation:
Provide adequate covering and protection of the surrounding areas to prevent damage during work.
2. Removal of Existing Floor Tiles:
Carefully remove and dispose of existing floor tiles in the designated balcony area (approx. 20 sq.m). Ensure all waste materials are disposed of as per Dubai Municipality (DM) regulations.
Surface Preparation:
Clean the substrate and prepare the surface for the new tiling, including necessary screeding to create an appropriate slope for water runoff. Break and remove any concrete and debris from the floor as needed for proper drainage slope but to avoid damage of any existing waterproof
Waterproofing Application:
Supply and Apply a high-quality liquid waterproofing for external use to the entire prepared floor area to prevent future leakage. Ensure proper application around all edges and seams for full coverage.
Waterproofing Testing:
Conduct a thorough water test ( 48 hrs) to confirm the integrity and effectiveness of the waterproofing system, ensuring there are no leaks.
Drainage Pipe Installation:
Supply and install a new balcony floor ( Horizontal) and external vertical drainpipe (size 3” or 4”, depending on the requirement.
Ensure the new drainpipe is properly installed with all necessary accessories and connections. Connect the new balcony drain line to the external drain line, ensuring all connections are watertight and secure with cleat out and Y connection as per requirement.
Coring:( Depends as per site requirement but to avoid if possible any other alternative)
Core a single spot on the balcony up stand to create connection for the new drainage system.
Tiling Installation:
Apply adhesive and install new floor porcelain tiles ( 10mm) with the proper slope to ensure effective water drainage. Install tiles with proper alignment, ensuring a clean finish and that the slope facilitates water runoff towards the linear drain
Linear Drain Installation:
Supply and install a Heavy duty stainless steel anti rust Linear Drain (approx. 2 meters) in the required location to ensure proper water flow and drainage from the balcony.
Grouting:
Grout all installed tiles once the adhesive has set, ensuring even filling and a seamless finish between tiles.

4. Finalization



Cleaning and Waste Disposal:
Thoroughly clean the balcony area after completing the work, removing any debris, dust and excess grout. Dispose of all civil waste in accordance with Dubai Municipality’s regulations, ensuring compliance with all safety and environmental guidelines.

Material Specifications*:


Waterproofing material - Liquid applied material, suitable for outdoor applications and balconies. Tiles: High-quality outdoor Porcelain tiles ( RAK) with proper anti-slip properties (sample to be provided ) on client’s approval). Size of Tile (30x30) or (40X40)
Drainage Pipe: PVC or similar material suitable for external drainage and with a size of 3” or 4” (based on site requirements). Linear Drain: Stainless steel corrosion-resistant material, suitable for external environments.

Warranty Period*:


Waterproofing: The waterproofing system will be covered under a 5-year warranty, ensuring protection against leaks and water penetration, provided there are no modifications or damage caused by the client post-installation.
Tiling Work: The tiling installation (including adhesives and grouting) will carry a 5-year warranty for defects in materials or workmanship under normal usage conditions.
Drainage System: The installation of the external drain line and linear drain will be warranted for 5 year against any issues related to material defects or installation errors.

Health & Safety Considerations*:


All workers will use appropriate protective equipment (PPE) such as gloves, goggles, and safety shoes during the course of the work. Scaffolding or man lifts if require ( contractor scope) will be set up following all safety standards to prevent accidents.
Note- Authority Permit is contractor scope. - Site Visit need to confirm Scope and quantity to be confirmed with FM and site - Variation not acceptable.

NOTE TO VENDORSAs per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant authority in the Emirate of Dubai. Before you apply for any job in the Emirate of Dubai, please make sure to comply with regulatory requirements. Failure to do so can result in stoppage of funds through Escrow Account. *HOAM bears no liability towards any payment that is withheld by the Escrow Operator.


b. consider all risks, contingencies and other circumstances relating to the delivery of the Requirements and include adequate provision in its Proposal to manage such risks and contingencies. c. document in its Proposal all assumptions and qualifications made about the delivery of the Requirements, including any assumption that HOAM or a third party will deliver any aspect of the Requirements or incur any cost related to the delivery of the Requirements. 12. HOAM will convene an evaluation panel comprising members chosen for their relevant expertise and experience. In addition, HOAM may invite independent advisors to evaluate any Proposal, or any aspect of any Proposal. a. each Vendor’s understanding of the Requirements, capability to fully deliver the Requirements and willingness to meet the terms and conditions of the Proposed Contract 22. HOAM will advise Vendors if they have been shortlisted or not. Being shortlisted does not constitute acceptance by HOAM of the Vendor’s Proposal, or imply or create any obligation on HOAM to enter into negotiations with, or award a Contract for delivery of the Requirements to any shortlisted Vendor/s. At this stage in the RFP process HOAM will not make public the names of the shortlisted Vendors.
1. All enquiries regarding the RFP must be directed to HOAM’s Point of Contact.
2. Vendors must not directly or indirectly approach any representative of HOAM, or any other person, to solicit information concerning any aspect of the RFP.
3. Only the Point of Contact, and any authorised person of HOAM, are authorised to communicate with Vendors regarding any aspect of the RFP. HOAM will not be bound by any statement made by any other person.
4. HOAM may change the Point of Contact at any time. This notification may be posted on the system.
Where a Vendor has an existing contract with HOAM then business as usual communications, for the purpose of managing delivery of that contract, will continue using the usual contacts. Vendors must not use business as usual contacts to lobby HOAM, solicit information or discuss aspects of the RFP.
6. Each Vendor must accept and adhere to the Conflict of Interest declaration in the Response Form and must immediately inform HOAM should a Conflict of Interest arise during the RFP process. A material Conflict of Interest may result in the Vendor being disqualified from participating further in the RFP.
7. Vendors must not attempt to influence or provide any form of personal inducement, reward or benefit to any representative of HOAM in relation to the RFP.
8. A Vendor who attempts to do anything prohibited may be disqualified from participating further in the RFP process.
9. HOAM reserves the right to require additional declarations, or other evidence from a Vendor, or any other person, thro
لقد تجاوزت الحد الأقصى لعدد التنبيهات الوظيفية المسموح بإضافتها والذي يبلغ 15. يرجى حذف إحدى التنبيهات الوظيفية الحالية لإضافة تنبيه جديد
تم إنشاء تنبيه للوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.
تم إلغاء تفعيل تنبيه الوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.