Supply, Testing and Commissioning BMS System
Services Posted On: December 6, 2024 Closing On: December 26, 2024
Supply, Testing and Commissioning BMS System Supply of all DDC Controllers with workstation. Supply of listed peripheral equipment’s and devices. Testing and Commissioning of all the DDC controllers by each point. Training with O&M Manual. Adding and integrating all the points by a graphical user interface on a new PC.
Building Name: Horizon Tower
Location: Marsa Street, Dubai Marina
Contact details: Engineer Ramana - 050 272 5615
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.