https://bayt.page.link/vNUC4Fp9QPSZh2sYA
أنشئ تنبيهًا وظيفيًا للوظائف المشابهة

الوصف الوظيفي

Supply, Installation and commissioning Air Curtain -1NoProduct Posted On: December 30, 2024 Closing On: January 6, 2025 01.Supply, Installation and commissioning Air Curtain - with all necessary supporting material-1No. 02.Air Curtain Olefini brand model X-20 (2 meter) with a maximum height of 3 meter. 03.AIR CURTAIN OLEFINI X-20 WITH A MAXIMUM HEIGHT OF 3 METER. 04.Magnetic Door Contact For Air Curtain-1no. 05.AIR CURTAIN INTEGRATION WORK Air Curtain integration with Limit Switch / Direct ingratiation by Relays and programming of the Operator 06.Aluminum Support- Lot. No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: (a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and (b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
لقد تجاوزت الحد الأقصى لعدد التنبيهات الوظيفية المسموح بإضافتها والذي يبلغ 15. يرجى حذف إحدى التنبيهات الوظيفية الحالية لإضافة تنبيه جديد
تم إنشاء تنبيه للوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.
تم إلغاء تفعيل تنبيه الوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.