https://bayt.page.link/Qe6T533MXH8vFNvM9
العودة إلى نتائج البحث‎
خدمات الدعم التجاري الأخرى
أنشئ تنبيهًا وظيفيًا للوظائف المشابهة

الوصف الوظيفي

Replacement of Exterior Façade Glass



Break Down Posted On: February 10, 2025 Closing On: February 12, 2025 Replacement of Exterior Façade Glass • Supply & Installation of 24 mm tempered Doubled Glazed glass unit (6mm Grey reflective tempered + 12mm air spacer + 6mm clear tempered glass) installed in existing Aluminum profiles, silicon filling and complete finishing. • Removal and installation of glass through building cradle. The work will be inclusive of cradle operator. Unit BB1-4504; Size – width 1180 & height 1525 No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

لقد تجاوزت الحد الأقصى لعدد التنبيهات الوظيفية المسموح بإضافتها والذي يبلغ 15. يرجى حذف إحدى التنبيهات الوظيفية الحالية لإضافة تنبيه جديد
تم إنشاء تنبيه للوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.
تم إلغاء تفعيل تنبيه الوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.