Repair of Barrier GF Parking
Break Down Posted On: April 4, 2025 Closing On: April 16, 2025
Scope of Work
The contractor shall provide all necessary labor, tools, equipment, materials, and expertise to complete the following tasks:
-
Inspection & Assessment:
Conduct a comprehensive inspection of the barrier control board.
Identify all faults, defects, and malfunctioning components.
Provide a detailed diagnostic report.-
Repair & Replacement:
Repair faulty components as identified during the inspection.
Replace damaged parts where necessary with compatible and high-quality replacements.
Ensure all repairs meet manufacturer specifications and industry standards.-
Testing & Validation:
Perform functional testing to verify the repair quality and ensure full operational capability.
Address any detected issues promptly until full functionality is achieved.
* Provide completion report with pictures