Rectification works Pump Room, LV Room, Control Room, Electrical Room
Enhancement Posted On: September 16, 2024 Closing On: October 1, 2024 Solicitation for rectification of the affected area as per technical report attached and as per mentioned below:
Staircase area and Pump Room
- Need to fix the water leakage in the pump room.
- Need to fix all the cracks in the pump room
- Need to paint the wall and the floor
Ground floor LV room and Control room and Electrical room
- Need to fix all the cracks and paint the LV room
- Need to put a rubber matt in the LV room for safety purpose
Warranty and payment terms must be included in the proposal No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: (a) Vendor has obtained the prior written consent of Mansions CM to the use of the subcontractor, and (b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
NOTE TO VENDORS As per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant authority in the Emirate of Dubai. Before you apply for any job in the Emirate of Dubai, please make sure to comply with regulatory requirements. Failure to do so can result in stoppage of funds through Escrow Account. Mansions CM, bears no liability towards any payment that is withheld by the Escrow Operator.