الوصف الوظيفي
One time service, testing & maintenance of LV Switchgear SystemServices Posted On: December 30, 2024 Closing On: January 6, 2025 One time service, testing & maintenance of LV Switchgear System - LV PANELS - 1 Nos - ACB - 2 Nos. - CAPACIOTR BANKS - 1 Nos. - ATS - 1 Nos - SMDB -3No. ATS Panel Rectification. - Rectification of Generator ATS system Supply and Installation of control components for the ATS with Drawing ( SCHNEIDER MAKE) Testing and commissioning Removing of Existing faulty control component. Supply and Installation of new Control components with wiring. Connect the control cables to motorized MCCB auxiliary relays, motor and coils. Preparation of Drawing. Testing and Commissioning. Site Details: Site Name : Park One Building. Site Location: JVT. Site Contact Person: Kishan - 0568878085. No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: (a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and (b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.