Petrofac is a leading international service provider to the energy industry, with a diverse client portfolio including many of the world’s leading energy companies.
We design, build, manage and maintain infrastructure for our clients. We recruit, reward, and develop our people based on merit regardless of race, nationality, religion, gender, age, sexual orientation, marital status or disability. We value our people and treat everyone who works for or with Petrofac fairly and without discrimination.
The world is re-thinking its energy supply and energy security needs; planning for a phased transition to alternative energy sources. We are here to help our clients meet these evolving energy needs.
This is an exciting time to join us on this journey.
We support flexible working requests and have adopted a hybrid approach for most of our office-based roles. We ask employees to be present in the office at least three days per week.
Are you ready to bring the right energy to Petrofac and help us deliver a better future for everyone?
JOB TITLE: Inspector I - Quality ( Coating / Insulation/ Refractory )
KEY RESPONSIBILITIES:
Coating / Painting:
·Ensure weather conditions are acceptable in line with applicable standards/ specifications (Environmental, time and economic constraints).
·Ensure manufacturer’s instructions and MSDS are followed while handling & storage of Painting/Coating materials abrasives at site.
·Ensure that data sheets are available, material traceability is maintained and correct material used.
·Monitor performance of contractors, ensure Applicators are competent and where required have valid certification for the process in use, equipment is in serviceable condition.
·Ensure inspection and test equipment is serviceable, with in calibration period and personnel are knowledgeable in its use.
·Ensure weld area is covered before blasting, where pressure testing is not completed.
·Ensure protection of flange serration, instruments etc before blasting.
·Ensure surface preparation blast profile/cleanliness meet requirements.
·Continuous monitoring of surface cleanliness and record surface profile (Should take place at least three times during the coating process: before any surface preparation activities starts, after surface preparation, before coating begins and between each application of coating in a multi-coat system).
·Monitor wet film thickness during application and application technique.
·Monitor dry film thickness and recoating intervals.
·Ensure any identification marks or tags removed or over coated are replaced.
·After the full curing activity conduct visual inspection and specified non-destructive and/or destructive tests.
·Visual inspection after each coat (Verify correct shade, degree of gloss and evenness and be free from tackiness after drying/curing and free from cracks, holidays, runs sags, wrinkles, patches, brush or roller marks or other defects that may deleterious to the quality of the coating).
·Witness destructive tests as applicable in accordance with the project specifications (Holiday detection, Adhesion testing, Impact resistance testing, Cathodic dis-bondment testing, Thickness of coating on steel body, Thickness of coating on weld bead, Peel test, Overall degree of adhesion ,voids exposing bare metal).
·Check for any damages and defects upon completion of each stage of painting/coating works.
Insulation:
·Inspect insulation material to verify the manufacturer, type of product, and thickness of insulation, and batch number.
·Ensure manufacturer’s instructions and MSDS are followed while handling & storage of insulation materials at site.
·Verify insulation materials are stored off the floor under shade in secured and well-ventilated areas away from moisture and water which may lead loosening of insulation strength.
·Ensure insulation materials are stored separately based on type, width, and thickness.
·Ensure different manufacturer’s products are not allowed to combine and stored separately.
·Verify materials are used in the same order in which they are delivered, so that the order of consumption is first-in-first-out.
·Ensure System/Subsystem testing, reinstatement, and painting completed and released from piping /equipment prior to start insulation.
·Ensure pipe work and equipment are insulated as per line list and isometric.
·Ensure equipment insulation is as per the equipment data sheet.
·Verify heat traced piping/equipment are released prior to application of insulation.
·