6" Drainline Leakage Rectification Works (Unit 911 Shaft)
Services Posted On: August 16, 2024 Closing On: September 30, 2024
6" Drainline Leakage Rectification Works Supply of new PVC pipes and fittings
Fittings include Y fittings, reducer, elbow, socket and other necessary fittings
Pipeline size – 6”
Supply and fixing of temporary platform for access
Civil works include wall breaking for access, re-fixing and repainting works
Removal of existing pipes and fittings
Installation of new PVC pipes and fittings using necessary materials and consumables
Rectification and testing
Building Name: Yacht Bay Tower (2B + 17 + Roof)
Location: Marsa Street, Dubai Marina Site Contact: Engineer Abdul - 052 445 6588
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.