https://bayt.page.link/v1TUmrkCw1dqRip19
دوام كامل · الحد الأدنى 8 سنوات من الخبرة
500 موظف أو أكثر · الطاقة والموارد المتجددة

حمّل تطبيق بيت.كوم

حمّل تطبيق بيت.كوم لإدارة مراسلاتك الفورية مع خبير التوظيف
حمّل التطبيق
أنشئ تنبيهًا وظيفيًا للوظائف المشابهة

الوصف الوظيفي

I&C Engineer will carry out preventive, predictive and breakdown maintenance, in a safe manner, of C&I systems & equipment to ensure high reliability, availability and reduced failure.


The job holder takes care of all I&C maintenance work in the plant and guides his team to achieve high reliability and availability of C&I systems, without compromising in any way the safety of person and equipment. He should be a team player with proactive attitude and dedicated to the above work requirements and in addition displays willingness to take on any added responsibility as dictated on a day to day basis under the guidance of the Maintenance Manager. He is expected to keep pace with relevant technological developments and should be quick to implement any such strategy for economic or long-term advantage for the company


Minimum Qualifications:

  • Bachelors degree holder of Instrumentation or Control or Electronics Engineering.

Minimum Experience:

  • 10 years’ experience of working with C&I systems, ideally in a Power station.
  • Prior experience of preventive & predictive maintenance in C&I systems for desalination plant, preferably in R.O Plant.
  • Prior experience in Metso or similar DCS systems.
  • Fully conversant with Field instrumentation and network communication.
  • Fully conversant with safety and rescue rules.  


المرشح المفضل

عدد سنوات الخبرة
الحد الأدنى: 8
الشهادة
بكالوريوس/ دبلوم عالي

We are a developer, investor and operator of power generation and desalinated water plants with 90 assets in operation, construction or advanced development across 13 countries. We employ more than 4,000 people with ~60% local employment. ACWA Power's portfolio, with an investment value of USD 94 billion, can generate 65.6 GW of power and produce 8.0 million m3 /day of desalinated water.

لقد تجاوزت الحد الأقصى لعدد التنبيهات الوظيفية المسموح بإضافتها والذي يبلغ 15. يرجى حذف إحدى التنبيهات الوظيفية الحالية لإضافة تنبيه جديد
تم إنشاء تنبيه للوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.
تم إلغاء تفعيل تنبيه الوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.