Wood is currently recruiting for a Civil and Structure Construction Supervisor (Iraqi local nationals only) this position, and work pattern is 4 weeks ON X 4 weeks OFF, we can only consider applications from local Iraqi nationals residing in Basra and surrounding areas.
This is a highly strategic role within the department and the ideal candidate will be at Principal or Lead level in their career with extensive years of experience within the industry in a similar role
The Phase 1 will restore, upgrade, and develop the current plant (CPF1) including: Restoration of initial CPF1 capacity; building a new export pipeline (24”, ~30km); restoration of CPF1 integrity and operability (dated 2008); flaring reduction by Q1/Q2 2026 and released water; development of new flowlines, pads, and electrification network for approximately 30 new wells; debottlenecking of the plant; upgrade of the Safety and Security facilities